Cello Number 1, The Sleeping Beauty
Cello Sample Video
24 sub-albums and No images in this album.
[Login]
Gallery:
Cello Making Gallery
Album:
Cello Number 1, The Sleeping Beauty
Album:
Day One, The endblocks emerge
Last change: 09/01/06
Contains: 11 items.
Album:
Day Two, the neck endblock
Last change: 09/02/06
Contains: 7 items.
Album:
Day Three, finishing all the blocks and glueing them into the mold
Last change: 09/02/06
Contains: 11 items.
Album:
Day Four, levelling the blocks
Last change: 10/07/06
Contains: 8 items.
Album:
In preparation for the ribs
Last change: 09/02/06
Contains: 6 items.
Album:
Day Five, Planing the ribs to the correct height
Last change: 10/07/06
Contains: 4 items.
Album:
Making More Tools
Last change: 10/15/06
Contains: 5 items.
Album:
Day Six, thinning ribs
Last change: 10/07/06
Contains: 11 items.
Album:
Day Seven, cleaning blocks and bending c-ribs
Last change: 10/07/06
Contains: 12 items.
Album:
Day Eight, gluing my very first rib
Last change: 10/08/06
Contains: 6 items.
Album:
Day Nine, The second C-Rib and preparing linings
Last change: 10/08/06
Contains: 5 items.
Album:
Day Ten, an hour leveling the c-ribs
Last change: 10/11/06
Contains: 2 items.
Album:
Day Eleven, Finishing the blocks and bending the ribs
Last change: 10/11/06
Contains: 17 items.
Album:
Day Twelve, gluing on the upper ribs
Last change: 10/14/06
Contains: 10 items.
Album:
Day Thirteen, gluing on the lower ribs
Last change: 10/16/06
Contains: 20 items.
Album:
Day Forteen, Levelling the ribs and trimming the corners
Last change: 10/16/06
Contains: 11 items.
Album:
Day Fifteen, Cutting mortices and bending linings
Last change: 10/23/06
Contains: 8 items.
Album:
Day Sixteen, bending the top linings and gluing them in
Last change: 10/23/06
Contains: 5 items.
Album:
Day Seventeen, gluing the bottom linings in
Last change: 10/23/06
Contains: 11 items.
Album:
Day Eighteen, Fixing gaps and starting to level
Last change: 10/28/06
Contains: 7 items.
Album:
Day Nineteen, Leveling the lower ribs
Last change: 10/28/06
Contains: 6 items.
Album:
Day Twenty, Leveling the upper ribs and finishing the linings
Last change: 11/03/06
Contains: 13 items.
Album:
Day Twenty one, an hour removing the mold
Last change: 03/03/07
Contains: 8 items.
Album:
Day Twenty Two, finishing off the ribs
Last change: 03/03/07
Contains: 12 items.
Gallery:
Cello Making Gallery
Album:
Cello Number 1, The Sleeping Beauty
© 1998-2004 Drazan Enterprise